72 M Non-Standard Bow String Girder

  • Home
  • /
  • 72 M Non-Standard Bow String Girder

72 M Non-Standard Bow String Girder

imgservices
Work 72M Bow String girder in Connection of proposed ROB between station Shamlaji road & Raigadh road at railway km 297/3-4 & Br.no. - 814 in connection of six lanning of Rajasthan / Gujarat border at km 401.200 to 494.410 of NH-8 in the states of Gujarat.
Client Name National Highway Authority of India
Contractor Name Apex tarmac Pvt Ltd.
Fabricator Name MUKHTAR ENGINEERING AND CONSTRUCTION.
Total weight 910 MT
Fabrication year 2025-2026
Span 1
Length of Span 72 M
Total Quantity of steel fabrication 910 MT

We were founded in 1992, by Shree Mehboob khan Pathan, as a pile foundation firm named as Mukhtar foundations and in 2012, we started a partnership firm named Mukhtar projects pvt ltd. We were promoted and managed by Chairman & founder, Shree Mehboob khan pathan, CEO, Pankaj P Patel and our Whole Time Director, Shree Mobin Khan Pathan and team. We have started a firm named Mukhtar Engineering and Construction in 2015 as a partnership firm having and RDSO vendor ship for fabricating all type of steel girders with high-tech equipment’s.

RECENT POSTS

150M Arch Bridge

The Rani Kamlapati Arch Bridge (also known as the Ginnori Arch Bridge) is a 150-metre-long steel bowstring arch bridge spanning the Lower Lake in Bhopal. For erection a full 150 M platform was prepared and an specialized crane was designed.

72 M Non-Standard Bow String Girder

End pushing launching method with weight of 910 MT,

CONTACT INFO

HEAD OFFICE :  PLOT NO-824, B/H SURANY PLY, RAJGADH ROAD, NR RASKA CANAL, GHODASAR, KHEDA, GUJARAT-387140. AHMEDABAD OFFICE :  SHOP NO. A-02-FF, PARISHRAM INDUSTRIAL COTTAGE, RAMOL ROAD, RAMOL, Ahmedabad, GUJARAT 382449 PHONE :  (+91) 81402 72666 PHONE :  (+91) 99251 49895 PHONE :  (+91) 98250 14992 EMAIL :  mukhtarengg.const@gmail.com
PLEASE FILL YOUR EMAIL BELOW
Thank you for fill your email